Search concepts
|
Selected filters
|
Search results
-
Active
-
-
-
Finished
FFC: Future Proof Flexible Charging: Dealing with uncertain prices and network constraints
de Weerdt, M. M., Spaan, M. T. J., Lane, N. R., Morales Espana, G. A. & van der Linden, J. G. M.
1/02/17 → 15/09/19
Project: NWO
-
REACH: Resource Efficient Automatic Conversion of High-Altitude Wind
Schmehl, R., Peschel, J. O. & Schelbergen, M.
1/12/15 → 31/08/19
Project: Horizon 2020
File -
AWESCO: Airborne Wind Energy System Modelling, Control and Optimisation
Schmehl, R., Viré, A. C., Candade, A. A., Thedens, P., Folkersma, M. A. M. & Rapp, S.
1/01/15 → 31/12/18
Project: Horizon 2020
-
GCP: Gaming beyond the Copper Plate
de Weerdt, M. M., Spaan, M. T. J., de Vries, L. J., Witteveen, C., van der Sluis, L., Walraven, E. M. P., Philipsen, R. M., Morales Espana, G. A. & Ramirez Elizondo, L. M.
1/10/14 → 31/10/18
Project: NWO
-
NUMIWING: NUMIWING (Numerical modelling of inflatable airborne wind energy systems)
1/10/12 → 30/09/17
Project: FP7