INIS
installation
100%
construction
100%
wind turbines
100%
vessels
100%
efficiency
50%
weather
50%
control
25%
perturbation theory
25%
hydraulics
25%
budgets
25%
applications
25%
simulation
25%
motion
25%
lifts
25%
maintenance
25%
cost
25%
water
25%
stability
25%
installation sites
25%
algorithms
25%
depth
25%
Engineering
Installation
100%
Wind Turbine
100%
Efficiency
66%
Floating Offshore Wind Turbine
33%
Application
33%
Installation Site
33%
Loop Stability
33%
High Percentage
33%
Offshore Installation
33%
Water
33%
Compensator
33%
Control Algorithm
33%
Relative Motion
33%
Closed Loop
33%
Assembly
33%
Simulation Result
33%
Hydraulics
33%
High Cost
33%
Keyphrases
Catamaran
100%
Active Heave Compensation
100%
Installation Efficiency
100%
Active Heave Compensator
50%
Project Budget
50%