Abstract
The problem of smoothing dry weather inflow variations for
a Waste Water Treatment Plant (WWTP) that receives sewage from
multiple mixed sewer systems is presented, together with a first rough
solution algorithm. A simplification followed by a naive translation into
a zero-one linear programming problem results in 1152 inequalities for
480 binary variables.
a Waste Water Treatment Plant (WWTP) that receives sewage from
multiple mixed sewer systems is presented, together with a first rough
solution algorithm. A simplification followed by a naive translation into
a zero-one linear programming problem results in 1152 inequalities for
480 binary variables.
Original language | English |
---|---|
Number of pages | 5 |
Publication status | Published - 2016 |
Event | 9th International Workshop for Constraint Programming and Decision Making - Angstrom Lab, Uppsala, Sweden Duration: 25 Sept 2016 → 25 Sept 2016 Conference number: 9 http://coprod.constraintsolving.com/CoProD2016-book-of-abstracts.pdf |
Workshop
Workshop | 9th International Workshop for Constraint Programming and Decision Making |
---|---|
Abbreviated title | CoProD'16 |
Country/Territory | Sweden |
City | Uppsala |
Period | 25/09/16 → 25/09/16 |
Internet address |
Keywords
- Water Management
- Branch and Bound