Original language | Undefined/Unknown |
---|---|
Title of host publication | Building Networks for a Brighter Future |
Editors | P Heijnen |
Place of Publication | Rotterdam |
Publisher | IEEE |
Pages | 1-7 |
Number of pages | 7 |
Publication status | Published - 2008 |
Event | International conference on infrastructure sytems 2008: Building Networks for a Brighter Future - Rotterdam Duration: 10 Nov 2008 → 12 Nov 2008 |
Publication series
Name | |
---|---|
Publisher | IEEE |
Conference
Conference | International conference on infrastructure sytems 2008: Building Networks for a Brighter Future |
---|---|
Period | 10/11/08 → 12/11/08 |
Bibliographical note
Informatiedrager was USB stick; dit paper komt veel overeen met het andere met dezelfde titel, maar is niet geheel gelijk.Keywords
- conference contrib. refereed
- Conf.proc. > 3 pag