Dedicated on-site condition monitoring of high voltage power cables up to 150kV

E Gulski, PP Seitz, B Quak, F Petzold, F de Vries

    Research output: Contribution to journalArticleScientific

    1 Citation (Scopus)

    Abstract

    For advanced, non-destructive on-site condition monitoring of HV power cables up to 150kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system. One of the methods available for this purpose is based on applying damped AC voltages up to 150kV. In this paper, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of the ultra light system (300kg) which is able to test cables up to 20km lengths.
    Original languageUndefined/Unknown
    Pages (from-to)1-15
    Number of pages15
    JournalInternational Journal of Emerging Electric Power Systems
    Volume9
    Issue number3
    Publication statusPublished - 2008