Skip to main navigation Skip to search Skip to main content

Desulfurization Challenges in the Transition to Green Steel Production

Research output: Chapter in Book/Conference proceedings/Edited volume › Conference contribution › Scientific › peer-review

Abstract

As a result of the global transition towards green steel production, integrated steel plants are optimizing the existing processes and/or adopting new steelmaking methods to minimize their carbon footprint. These adjustments affect desulfurization conditions and requirements. The present study examines how the desulfurization is impacted for both hot metal and liquid steel across three routes: the traditional blast furnace (BF) - basic oxygen furnace (BF-BOF) with increased scrap ratio, the direct reduced iron (DRI) - electric arc furnace (EAF) with varying scrap to DRI ratios, and the DRI - electric smelting furnace (ESF) - BOF. This work discusses challenges and possible solutions for each route.

Original languageEnglish
Title of host publicationProceedings of the Iron and Steel Technology Conference, AISTech 2025
PublisherAssociation for Iron and Steel Technology, AISTECH
Pages859-868
Number of pages10
ISBN (Electronic)9780930767372
DOIs
Publication statusPublished - 2025
Event2025 Iron and Steel Technology Conference, AISTech 2025 - Nashville, United States
Duration: 5 May 2025 → 8 May 2025

Publication series

NameAISTech - Iron and Steel Technology Conference Proceedings
ISSN (Print)1551-6997

Conference

Conference2025 Iron and Steel Technology Conference, AISTech 2025
Country/TerritoryUnited States
CityNashville
Period5/05/25 → 8/05/25

Keywords

  • Basic oxygen furnace
  • Desulfurization
  • Direct reduced iron
  • Electric arc furnace
  • Electric smelting furnace
  • Green steel production
  • Scrap ratio
  • Steelmaking alternative routes

Fingerprint

Dive into the research topics of 'Desulfurization Challenges in the Transition to Green Steel Production'. Together they form a unique fingerprint.

Cite this