Skip to main navigation Skip to search Skip to main content

Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study

  • Ming Shan Ng*
  • , Konrad Graser
  • , Daniel Mark Hall
  • *Corresponding author for this work

Research output: Contribution to journal › Article › Scientific › peer-review

Abstract

Digital Fabrication (DFAB) is a systemic innovation with low adoption rates in architecture, engineering and construction (AEC) projects. Managing requirements of a new design process is one major challenge for the increased DFAB adoption. For other types of innovations, practices such as Building Information Modelling (BIM) and Early Contractor Involvement (ECI) improve design management by integrating process, information and organisation in construction projects. In theory, BIM and ECI could improve design management and increase the adoption of DFAB. However, the relationship between DFAB, BIM and ECI has not yet been studied thoroughly. There is a need to understand new paradigms of DFAB design management in regard to process integration, information integration and organisational integration. This study undertakes a comparative study of four DFAB adoptions in AEC projects with varying levels of BIM and ECI implementation. The design processes of DFAB are traced using swimlane process diagrams. From this, relationships between DFAB, BIM, and ECI are derived using a quadripartite interrelationship diagram. This work illustrates the proposed relationships in DFAB adoption in design using a fishbone diagram. This work concludes with potential future research in design management for digital fabrication, including five takeaways for practitioners to adopt and manage DFAB in the design process of construction projects.

Original languageEnglish
Pages (from-to)39-55
Number of pages17
JournalArchitectural Engineering and Design Management
Volume19
Issue number1
DOIs
Publication statusPublished - 2023
Externally publishedYes

Keywords

  • BIM
  • comparative case study
  • design management
  • Digital fabrication
  • early contractor involvement

Fingerprint

Dive into the research topics of 'Digital fabrication, BIM and early contractor involvement in design in construction projects: a comparative case study'. Together they form a unique fingerprint.

Cite this