Abstract
Design for manufacturing and assembly (DfMA) is an engineering methodology which aims to increase ease of manufacture and efficiency of assembly by considering manufacturing and assembly constraints in the design process. However, current DfMA approaches in the construction sector are not automated enough to identify the design features that may cause project delay in real time. This leads to longer design cycle. Also, current scheduling algorithms rely on human intervention to generate activity network from a design output. Addressing these inefficiencies, we propose an interpretative machining learning model to predict the construction duration given a design output. More importantly, the same model identifies the design features that may cause the most delay in the project. The model is trained on a residential design dataset with various features, such as layout, geometry, and element typology. The output of the model is the project duration and an importance map, indicating the influence each feature of the given design has on the total project duration. The results from this model can considerably reduce the design cycle by supporting architects to create fabrication and assembly aware design even when they have little knowledge of production and assembly processes. This model will contribute to a novel computational approach for DfMA.
| Original language | English |
|---|---|
| Title of host publication | Computing in Civil Engineering 2023 |
| Subtitle of host publication | Visualization, Information Modeling, and Simulation - Selected Papers from the ASCE International Conference on Computing in Civil Engineering 2023 |
| Editors | Yelda Turkan, Joseph Louis, Fernanda Leite, Semiha Ergan |
| Place of Publication | Reston, VA |
| Publisher | American Society of Civil Engineers (ASCE) |
| Pages | 163-170 |
| Number of pages | 8 |
| ISBN (Electronic) | 978-0-7844-8524-8 |
| Publication status | Published - 2024 |
| Event | ASCE International Conference on Computing in Civil Engineering 2023: Visualization, Information Modeling, and Simulation, i3CE 2023 - Corvallis, United States Duration: 25 Jun 2023 → 28 Jun 2023 |
Conference
| Conference | ASCE International Conference on Computing in Civil Engineering 2023: Visualization, Information Modeling, and Simulation, i3CE 2023 |
|---|---|
| Country/Territory | United States |
| City | Corvallis |
| Period | 25/06/23 → 28/06/23 |
Bibliographical note
Green Open Access added to TU Delft Institutional Repository 'You share, we take care!' - Taverne project https://www.openaccess.nl/en/you-share-we-take-careOtherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.