Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility

Research output: Contribution to journalArticleScientificpeer-review

10 Citations (Scopus)
133 Downloads (Pure)

Fingerprint

Dive into the research topics of 'Infrastructure maintenance and replacement optimization under multiple uncertainties and managerial flexibility'. Together they form a unique fingerprint.

INIS

Engineering

Chemical Engineering