Abstract
Connection of Distributed Generation (DG) units to a distribution network will result in a local voltage increase. As there will be a maximum on the allowable voltage increase, this will limit the maximum allowable penetration level of DG. By reactive power compensation (by the DG unit itself) a significant increase in allowable penetration level can be achieved. In this paper this and several methods (overrating and generation curtailment) are investigated to achieve a further increase in allowable penetration level.
Original language | Undefined/Unknown |
---|---|
Title of host publication | Proceedings 20th International conference and exhibition on electricity distribution, CIRED 2009 |
Editors | s.n. |
Place of Publication | Stevenage |
Publisher | IET Services Ltd. |
Pages | 1-4 |
Number of pages | 4 |
ISBN (Print) | 978-1-84919-126-5 |
Publication status | Published - 2009 |
Event | CIRED 2009: 20th International conference and exhibition on electricity distribution - Prague, Czech Republic Duration: 8 Jun 2009 → 11 Jun 2009 Conference number: 20 |
Publication series
Name | |
---|---|
Publisher | IET Services Ltd. |
Conference
Conference | CIRED 2009 |
---|---|
Country/Territory | Czech Republic |
City | Prague |
Period | 8/06/09 → 11/06/09 |
Keywords
- conference contrib. refereed
- Conf.proc. > 3 pag