Abstract
This paper presents a research endeavouring to model site work in a 4D BIM model. Next simulations are performed with this model in 5 scenarios including specific interventions in work organisation, notably changing positons of facilities for site workers. A case study has been done in a construction project in the Netherlands. The research has showed the possibility to model time use of site workers in 4D BIM. Next the research has showed potential to perform and calculate specific interventions in the model, and prospect realistic changes in productive time use as a result.
Original language | English |
---|---|
Title of host publication | Proceedings of the 26th Annual Conference of the International Group for Lean Construction (IGLC 2018) |
Editors | Vicente Gonzalez |
Publisher | IGLC (International Group for Lean Construction) |
Pages | 155-165 |
DOIs | |
Publication status | Published - 2018 |
Event | IGLC 2018: 26th Annual Conference of the International Group for Lean Construction - Chennai, India Duration: 16 Jul 2018 → 20 Jul 2018 |
Conference
Conference | IGLC 2018: 26th Annual Conference of the International Group for Lean Construction |
---|---|
Country/Territory | India |
City | Chennai |
Period | 16/07/18 → 20/07/18 |
Keywords
- BIM
- time use
- simulation
- site work
- labour optimisation