Pilot Proof-Load Test on Viaduct De Beek: Case Study

Eva Lantsoght, Rutger Koekkoek, Cor van der Veen, Dick Hordijk, A. de Boer

Research output: Contribution to journalArticleScientificpeer-review

183 Downloads (Pure)

Abstract

For existing bridges, proof-load testing can be a suitable assessment method. This paper addresses the evaluation of a posted reinforced concrete slab bridge over a highway through proof-load testing, detailing the preparation, execution, and analysis of the test. As the target proof-load and the required measurements for proof-load testing currently are not well-defined in the existing codes, this pilot case was used to develop and evaluate proposed recommendations for proof-load testing for a future guideline on proof-load testing for the Netherlands. Moreover, the pilot proof-load test is used to study the feasibility of proof-load testing for both shear and flexure
Original languageEnglish
Article number05017014
Number of pages15
JournalJournal of Bridge Engineering
Volume22
Issue number12
DOIs
Publication statusPublished - 2017

Fingerprint

Dive into the research topics of 'Pilot Proof-Load Test on Viaduct De Beek: Case Study'. Together they form a unique fingerprint.

Cite this