Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags

Kim van den Houten, Léon Planken, Esteban Freydell, David M.J. Tax, Mathijs de Weerdt

Research output: Contribution to journalConference articleScientificpeer-review

5 Downloads (Pure)

Abstract

This study investigates scheduling strategies for the stochastic resource-constrained project scheduling problem with maximal time lags (SRCPSP/max). Recent advances in Constraint Programming (CP) and Temporal Networks have re-invoked interest in evaluating the advantages and drawbacks of various proactive and reactive scheduling methods. First, we present a new, CP-based fully proactive method. Second, we show how a reactive approach can be constructed using an online rescheduling procedure. A third contribution is based on partial order schedules and uses Simple Temporal Networks with Uncertainty (STNUs). Our statistical analysis shows that the STNU-based algorithm performs best in terms of solution quality, while also showing good relative offline and online computation time.
Original languageEnglish
Pages (from-to)26534-26541
Number of pages8
JournalProceedings of the AAAI Conference on Artificial Intelligence
Volume39
Issue number25
DOIs
Publication statusPublished - 2025
Event39th Annual AAAI Conference on Artificial Intelligence, AAAI 2025 - Philadelphia, United States
Duration: 25 Feb 20254 Mar 2025
https://aaai.org/conference/aaai/aaai-25/

Bibliographical note

Green Open Access added to TU Delft Institutional Repository 'You share, we take care!' - Taverne project https://www.openaccess.nl/en/you-share-we-take-care
Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.

Fingerprint

Dive into the research topics of 'Proactive and Reactive Constraint Programming for Stochastic Project Scheduling with Maximal Time-Lags'. Together they form a unique fingerprint.

Cite this