INIS
design
100%
compliance
100%
satellites
100%
radar
100%
apertures
100%
monitoring
37%
engineers
25%
planning
25%
surfaces
12%
zones
12%
landslides
12%
risks
12%
values
12%
soils
12%
spatial resolution
12%
information
12%
construction
12%
guidelines
12%
investigations
12%
highways
12%
complement
12%
Earth and Planetary Sciences
Compliance
100%
Proving
100%
Project
66%
Infrastructure
50%
Area
50%
Convention
33%
Radar Tracking
33%
Slope
16%
Temporal Resolution
16%
Construction
16%
Region
16%
In Situ
16%
Standard
16%
Investigation
16%
Soil
16%
Highway
16%
Focusing
16%
Average
16%
Engineering
Radar
100%
Design Code
100%
Satellites
100%
Stages
83%
Infrastructure
66%
Radar Observation
33%
Existing Slope
16%
Large Displacement
16%
Eurocodes
16%
Lifecycle
16%
Soil Investigation
16%
Design Decision
16%
Early Stage
16%
Computer Science
Planning Stage
50%
Standards
25%
Operational Stage
25%
Renovation Project
25%