Engineering
Control Room
33%
Demonstrates
33%
Electric Power Distribution
33%
Failure (Mechanical)
100%
Failure Event
66%
Installation
33%
Minimization
66%
Multiobjective Optimization
33%
Negative Impact
66%
Normal Condition
33%
Operational Cost
33%
Optimal Combination
33%
Optimization Approach
33%
Outlet Pressure
33%
Pressure Reducing Valve
33%
Real World
33%
Recovery
66%
Short Time
33%
System Part
33%
Water Distribution System
100%
INIS
bypasses
20%
control rooms
20%
equipment
20%
failures
100%
installation
20%
interventions
100%
minimization
40%
operating cost
20%
optimization
20%
pipes
20%
recovery
40%
valves
60%
volume
20%
water
20%
water distribution
100%
Chemical Engineering
Water
33%
Water Distribution
100%