Stability of breakwater roundheads during construction

Marcel R.A. Van Gent*, Ivo Van Der Werf

*Corresponding author for this work

Research output: Contribution to journalConference articleScientificpeer-review

Abstract

The presented study focussed on issues related to the hydraulic stability during the construction of rubble mound breakwaters. During construction the temporary roundheads differ from the roundheads in the final stage. Often a submerged uncompleted part of the breakwater is present in front of the section that reached its final crest elevation. This can occur because often the breakwater is being constructed with maritime-based equipment up to a certain elevation while the upper part of the breakwater is being constructed with land-based equipment. Three-dimensional physical model tests were performed to analyse the influence of the submerged part on the stability of the emerged part. The locations incurring the most damage clearly differ. Furthermore, for some combinations of water level, wave direction and structure geometry more damage was found for structures with a submerged part, although most combinations showed that the amount of displaced stones is generally lower for the structures with a submerged part.

Original languageEnglish
Number of pages15
JournalProceedings of the Coastal Engineering Conference
Publication statusPublished - 2010
Externally publishedYes
Event32nd International Conference on Coastal Engineering, ICCE 2010 - Shanghai, China
Duration: 30 Jun 20105 Jul 2010

Keywords

  • Construction
  • Rock slopes
  • Roundhead
  • Rubble-mound breakwaters
  • Wave basin
  • Wave loading

Fingerprint

Dive into the research topics of 'Stability of breakwater roundheads during construction'. Together they form a unique fingerprint.

Cite this