Teaching generative construction scheduling: Proposed curriculum design and analysis of student learning for the Tri-Constraint Method

Daniel M. Hall*, Irfan Čustović, Ravina Sriram, Qian Chen

*Corresponding author for this work

Research output: Contribution to journalArticleScientificpeer-review

6 Citations (Scopus)

Fingerprint

Dive into the research topics of 'Teaching generative construction scheduling: Proposed curriculum design and analysis of student learning for the Tri-Constraint Method'. Together they form a unique fingerprint.

INIS

Social Sciences

Engineering

Computer Science