TY - JOUR
T1 - The development of short pitch rail corrugation
T2 - Extensive field monitoring and validation of numerical predictions
AU - Zhang, Pan
AU - Li, Zili
PY - 2025
Y1 - 2025
N2 - Short pitch corrugation is a major rail defect worldwide, and its development mechanism remains not fully understood. This work aims to better understand corrugation and validate some numerical predictions through extensive field monitoring. 105 corrugations on four sections of mainline tracks were continually monitored for five years. Comprehensive field data were collected, including photos, geometry, and vehicle-track dynamic responses. Numerical results of corrugation development agree with the field observations. It confirms that corrugation initiates with necessary initial excitation, consistently grows at fixed locations due to differential wear, and eventually reaches a limiting amplitude. Moreover, vehicle-track longitudinal vibrations are crucial to corrugation initiation, while vertical vibration plays an increasingly important role in corrugation growth.
AB - Short pitch corrugation is a major rail defect worldwide, and its development mechanism remains not fully understood. This work aims to better understand corrugation and validate some numerical predictions through extensive field monitoring. 105 corrugations on four sections of mainline tracks were continually monitored for five years. Comprehensive field data were collected, including photos, geometry, and vehicle-track dynamic responses. Numerical results of corrugation development agree with the field observations. It confirms that corrugation initiates with necessary initial excitation, consistently grows at fixed locations due to differential wear, and eventually reaches a limiting amplitude. Moreover, vehicle-track longitudinal vibrations are crucial to corrugation initiation, while vertical vibration plays an increasingly important role in corrugation growth.
KW - Field validation
KW - Initiation and consistent growth
KW - Longitudinal vibrations
KW - Short pitch rail corrugation
UR - http://www.scopus.com/inward/record.url?scp=105005399194&partnerID=8YFLogxK
U2 - 10.1016/j.triboint.2025.110821
DO - 10.1016/j.triboint.2025.110821
M3 - Article
AN - SCOPUS:105005399194
SN - 0301-679X
VL - 210
JO - Tribology International
JF - Tribology International
M1 - 110821
ER -