The redesign process of the timetable for the Dutch railway sector: A theoretical approach

Femke Bekius*, Sebastiaan Meijer

*Corresponding author for this work

Research output: Contribution to journalArticleScientificpeer-review

5 Citations (Scopus)

Abstract

The design of a new timetable for a railway system is a complex process. Focusing only on the product and the exchange of information between design phases, does not cover the complexity. Strategic actor behaviour and contextual factors are underexposed by research on theory of designing civil infrastructures. Therefore, we investigate the redesign process of the timetable for the Dutch railways from two perspectives: 1) an engineering perspective; 2) an actor and context perspective. To indicate the successes and failures of the redesign process it is characterised using the PSI framework which includes these two perspectives. Several design phases are distinguished and at the transitions misalignments are identified. The misalignments are compared with empirical data to conclude on a set of improvements. Areas perceived as problematic are knowledge transfer between design phases, decomposition of one design phase into several products, and composition of multiple products into one final design.

Original languageEnglish
Pages (from-to)330-345
Number of pages16
JournalInternational Journal of System of Systems Engineering
Volume8
Issue number4
DOIs
Publication statusPublished - 2018

Keywords

  • Case study
  • CASs
  • Complex adaptive systems
  • Complexity
  • Design process
  • Design theory
  • Dutch railway sector
  • PSI framework
  • Railways
  • SoS
  • Systems of systems

Fingerprint

Dive into the research topics of 'The redesign process of the timetable for the Dutch railway sector: A theoretical approach'. Together they form a unique fingerprint.

Cite this