The role of lock-in cost overruns of large-scale transportation inrastructure projects

CC Cantarelli, B Flyvbjerg, GP van Wee, EJE Molin

Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

Original languageUndefined/Unknown
Title of host publicationBuilding Networks for a Brighter Future
EditorsP Heijnen
Place of PublicationRotterdam
PublisherIEEE
Pages1-6
Number of pages6
Publication statusPublished - 2008
EventInternational conferene on infrastructure systems 2008: Building Networks for a Brighter Future - Rotterdam
Duration: 10 Nov 200812 Nov 2008

Publication series

Name
PublisherIEEE

Conference

ConferenceInternational conferene on infrastructure systems 2008: Building Networks for a Brighter Future
Period10/11/0812/11/08

Bibliographical note

Informatiedrager was USB-stick

Keywords

  • conference contrib. refereed
  • Conf.proc. > 3 pag

Cite this