INIS
assessments
100%
barriers
100%
energy
25%
environmental impacts
25%
estuaries
25%
evaluation
100%
extraction
100%
grids
25%
hydraulics
100%
interactions
25%
levels
25%
maintenance
25%
modeling
25%
monitoring
25%
netherlands
25%
operation
25%
pilot plants
100%
power
25%
prediction
25%
storms
100%
surges
100%
tidal power
100%
tidal power plants
50%
turbines
50%
validation
25%
velocity
25%
water
25%
Earth and Planetary Sciences
Approach
25%
Area
25%
Array
50%
Assessment
100%
Environmental Impact
25%
Estuary
25%
Evaluation
100%
Flow Velocity
25%
Hydraulic Structure
75%
Investigation
25%
Netherlands
25%
Numerical Modeling
25%
Pilot Plant
100%
Plant
75%
Proving
25%
Storm Surge
100%
Tidal Power
100%
Turbine
50%
Water Current
25%
Water Level
25%
Engineering
Current Measurement
25%
Eastern Scheldt Storm Surge Barrier
100%
Environmental Impact
25%
Estuaries
25%
Flow Velocity
25%
Hydraulic Structures
75%
Hydraulics
25%
Level Measurement
25%
Local Scale
25%
Monitoring Study
25%
Numerical Modeling
25%
Power Grid
25%
Power Plant
50%
Quantification
25%
Storm Surge Barrier
25%
Turbine
50%