BIM implementation and project coordination in design-build procurement

Ajibade Aibinu, Eleni Papadonikolaki

Research output: Contribution to conferencePaperpeer-review

8 Citations (Scopus)

Abstract

Various procurement methods have been proposed as being more appropriate for implementing BIM. Simultaneously, BIM implementation affects the project coordination. Whereas many approaches to BIM implementation have considered integrated procurement, not all are applicable to various local markets. Particularly in the Netherlands, BIM implementation is characterized by 'ground-up' and self-regulated initiatives. This paper aims to explore and identify the relationship between design-build procurement and the emerging coordination structures from BIM. Exploratory case study research has been undertaken. The findings included two main coordination structures: centralized and decentralized. These two structures subsequently carry implications for various construction firms and their respective business models, as well as BIM implementation in general.

Original languageEnglish
Pages15-24
Number of pages10
Publication statusPublished - 2016
Event32nd Annual Association of Researchers in Construction Management Conference, ARCOM 2016 - Manchester, United Kingdom
Duration: 5 Sept 20167 Sept 2016

Conference

Conference32nd Annual Association of Researchers in Construction Management Conference, ARCOM 2016
Country/TerritoryUnited Kingdom
CityManchester
Period5/09/167/09/16

Keywords

  • Building Information Modelling
  • Coordination
  • Management
  • Procurement

Fingerprint

Dive into the research topics of 'BIM implementation and project coordination in design-build procurement'. Together they form a unique fingerprint.

Cite this