Pipe jacking has been the dominant trenchless technology for constructing small (\2 m) to medium-diameter (\4 m) tunnels. Uncertainties and construction difficulties increase significantly when the diameter of the tunnel exceeds 4 m. This paper presents a case study of the largest concrete pipe-jacking tunnel project in the world, the sewerage tunnel along Jinshan Lake, Zhenjiang, China. In this project, an underwater tunnel with a diameter of 4.67 m was constructed by the earth pressure balance (EPB) pipe-jacking method. The case study reports project background, and geological and hydrogeology conditions. The key techniques such as the selection of pipe-jacking machine, jacking force estimation and control, design of intermediate jacking station, grouting process control, launching, and reception of the tunnel boring machine, trajectory control of pipe jacking, and ventilation and gas monitoring during the construction period were investigated and discussed. Furthermore, to overcome the technical difficulties associated with the oversized jacked tunnel, the corresponding countermeasures were adopted point by point, so that the safety of the whole project could be guaranteed. This study filled the knowledge gap of technical know-how for large-diameter (over 4.5 m) pipe-jacking tunnel and is expected to provide practical guide for future large-diameter pipe-jacking tunnels.

Original languageEnglish
Pages (from-to)92-105
Number of pages14
JournalTransportation Research Record
Volume2676
Issue number7
DOIs
Publication statusPublished - 2022

Bibliographical note

Green Open Access added to TU Delft Institutional Repository 'You share, we take care!' - Taverne project https://www.openaccess.nl/en/you-share-we-take-care
Otherwise as indicated in the copyright section: the publisher is the copyright holder of this work and the author uses the Dutch legislation to make this work public.

Keywords

  • Grouting
  • Infrastructure
  • Lining
  • Pipe jacking
  • Tunnels and underground structures

Fingerprint