Identifying the Design Feature That Causes Project Delay in DfMA: A Dominant Element Analysis Method for Project Scheduling

Jianpeng Cao, Hang Zhang, Bo Pan, Ranjith Soman, Anton Savov, Daniel Hall

Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

2 Downloads (Pure)

Fingerprint

Dive into the research topics of 'Identifying the Design Feature That Causes Project Delay in DfMA: A Dominant Element Analysis Method for Project Scheduling'. Together they form a unique fingerprint.

Engineering

Keyphrases

INIS