T1 - Probabilistic scheduling of offshore operations using copula based environmental time series
T2 - An application for cable installation management for offshore wind farms
AU - Leontaris, George
AU - Morales-Nápoles, Oswaldo
AU - Wolfert, A. R M (Rogier)
PY - 2016/10/1
Y1 - 2016/10/1
N2 - There are numerous uncertainties that impact offshore operations. However, environmental uncertainties concerning variables such as wave height and wind speed are crucial because these may affect installation and maintenance operations with potential delays and financial consequences. In order to include these uncertainties into the duration estimation, adequate tools should be developed to simulate an installation scenario for a large number of historical environmental data. Data regarding environmental time series are usually scarce and limited, therefore they should be modelled. Since the environmental variables are in reality dependent, we propose a probabilistic method for their construction using copulas. To demonstrate the effectiveness of this method compared to the cases where observed or independently constructed environmental time series are used, a realistic cable installation scenario for an offshore wind farm was simulated. It was found that the proposed method should be followed to acquire more reliable and accurate estimation of the installation's duration.
AB - There are numerous uncertainties that impact offshore operations. However, environmental uncertainties concerning variables such as wave height and wind speed are crucial because these may affect installation and maintenance operations with potential delays and financial consequences. In order to include these uncertainties into the duration estimation, adequate tools should be developed to simulate an installation scenario for a large number of historical environmental data. Data regarding environmental time series are usually scarce and limited, therefore they should be modelled. Since the environmental variables are in reality dependent, we propose a probabilistic method for their construction using copulas. To demonstrate the effectiveness of this method compared to the cases where observed or independently constructed environmental time series are used, a realistic cable installation scenario for an offshore wind farm was simulated. It was found that the proposed method should be followed to acquire more reliable and accurate estimation of the installation's duration.
KW - Copulas
KW - Environmental time series
KW - Offshore wind farms
KW - Project management
KW - Simulation
KW - Stochastic model applications
UR - http://www.scopus.com/inward/record.url?scp=84984813471&partnerID=8YFLogxK
UR - http://resolver.tudelft.nl/uuid:f361f293-66a4-426f-9bf6-7610361fc8d1
U2 - 10.1016/j.oceaneng.2016.08.029
DO - 10.1016/j.oceaneng.2016.08.029
M3 - Article
AN - SCOPUS:84984813471
SN - 0029-8018
VL - 125
SP - 328
EP - 341
JO - Ocean Engineering
JF - Ocean Engineering
ER -