The role of gas turbine performance modeling in the operational optimization of the newly built alstom GTCC in lelystad, the Netherlands

SZ Boksteen, DJ van der Vecht, R Pecnik, JP van Buijtenen

Research output: Chapter in Book/Conference proceedings/Edited volumeConference contributionScientificpeer-review

Original languageEnglish
Title of host publicationThe future of gas turbine technology 6th international converence
Editors s.n.
Place of PublicationBrussel
PublisherEuropean turbine network (ETN)
Pages1-6
Number of pages6
Publication statusPublished - 2012
EventThe future of gas turbine technology 6th international conference - Brussel
Duration: 17 Oct 201218 Oct 2012

Publication series

Name
PublisherEuropean turbine network (ETN)

Conference

ConferenceThe future of gas turbine technology 6th international conference
Period17/10/1218/10/12

Keywords

  • Conf.proc. > 3 pag

Cite this

Boksteen, SZ., van der Vecht, DJ., Pecnik, R., & van Buijtenen, JP. (2012). The role of gas turbine performance modeling in the operational optimization of the newly built alstom GTCC in lelystad, the Netherlands. In s.n. (Ed.), The future of gas turbine technology 6th international converence (pp. 1-6). European turbine network (ETN).